High-End Renovations

High-end renovations on the Sunshine Coast

Penta renovates and extends established homes for owners who love where they live and want the house to finally match it. Beachside, canal and hinterland homes are our focus: properties where the location is right but the layout, the light or the finishes have fallen behind.

A renovation asks more of a builder than a new home. The existing structure has to be understood before it is changed, and the work often happens around a family's routine. We plan both carefully, with design and construction under one team, so nothing is left to be resolved on site.

Living room at Mons with curved white sofas, a stone-clad fireplace and full-height glazing to the pool
Is it right for you

When renovating is the right call

Renovating usually makes sense when the structure is sound and the home has qualities worth keeping: its position on the block, its orientation, a character you want to preserve or simply the familiarity of a place you know. It may also be the better path where planning rules would make a new dwelling harder to approve.

If the existing home would need so much change that little of it survives, a knock-down rebuild may be the better investment. We give you an honest view of both options at the feasibility stage, based on cost and risk rather than on which project we would prefer to take on.

The homes we renovate are usually lived in and loved, and that shapes how we work. We agree access, working hours and the areas trades can use before the job starts, protect the floors, joinery and landscaping that are staying, and keep you updated as each area is opened up, inspected and closed in again.

How it works

Our process

  1. 01

    Brief & Concept

    We inspect the existing home, review your brief, any drawings and your budget, and test the concept against real construction costs. The written feasibility report covers an indicative cost range, visible risks such as structural, waterproofing or services issues, and a GREEN, AMBER or RED budget alignment outcome.

  2. 02

    Value Management & Design Assistance

    We work with you and your designer to decide what stays, what changes and where the budget does the most good. Structure, services and the building envelope are resolved before finishes, so the renovation is designed around what the existing home can support.

  3. 03

    Construction & Delivery

    With documentation and engineering complete, every trade is priced in detail and you receive a firm fixed-price proposal. We then stage the works, protect the parts of the home that are staying, and manage trades and quality control through to handover.

Inclusions

What's included

  • Inspection of the existing structure, services and finishes
  • Feasibility report with an indicative cost range
  • Design coordination, engineering and approvals
  • Extensions, and kitchens, bathrooms and living areas within a wider plan
  • Integrated cabinetry, joinery and storage
  • Selections and finishes guidance
  • Firm fixed-price construction contract
  • Staging and site protection, with advice on whether to stay in the home
  • Cover under the QBCC Home Warranty Scheme
  • Commissioning, handover and defects rectification in line with QBCC requirements
Timing

How long a renovation takes

Renovation timing depends on the scope of work, the condition of the existing home and whether approvals are needed. A renovation within the existing footprint is a very different program from an extension or a whole-home refurbishment, and a renovation is usually quicker than a comparable new home.

Existing homes can hold surprises once linings come off, from timber damage to outdated wiring. We investigate as much as we can before pricing and build a realistic allowance into the program, so a discovery is managed rather than becoming a delay.

Whether you stay in the home during the works also shapes the program. Staged work lets you keep using part of the house but takes longer overall; moving out lets the trades work through the home in sequence. We set out the program and the staging options before the contract is signed.

FAQ

High-End Renovations: common questions

Can we live in the home during the renovation?

Sometimes. For contained work, such as a single wing or level, staged construction can let you keep using the rest of the home. For whole-home renovations, moving out is usually safer, quicker and less stressful. We advise on this at the feasibility stage, once the scope is clear.

Do renovations need approval?

Many do. Structural changes, extensions and changes to the building's footprint usually need building approval through a private certifier, and some sites also need council approval because of overlays or heritage and character controls. We identify what applies to your home and coordinate the applications.

What if the existing home contains asbestos?

Homes built in Queensland before 1990 may contain asbestos. Where it is suspected, materials are tested before work starts, and any removal is carried out by a licensed asbestos removalist in line with Queensland requirements.

Should we renovate or knock down and rebuild?

It depends on the condition of the existing home, how much of it you want to change and what the planning rules allow. We compare both paths on cost, risk and outcome at the feasibility stage and give you a clear recommendation.

What kinds of renovation do you take on?

We focus on substantial renovations where design quality and finishes matter: whole-home refurbishments, extensions, kitchens and bathrooms as part of a wider plan, and interior fitouts such as Mons. We are not the right fit for small repairs or single-trade jobs.

Next step

Start a conversation about your project

Tell us about your site, your priorities and your budget. We will review your enquiry and arrange an initial meeting to talk through the Penta process.